The Ready-Set-Go process:
The greatest product athletics from the very beginning
READY.
Get ready.
Feasibility, optimisation, economic efficiency. We proactively analyse your requirements based on decades of project competence.
Customer testimonials
„Competent people with a liking for competent products. At neo-plastic, I can always rely on my customer needs being understood.“
Development engineer
Roller bearing industry
„In neo-plastic, I value the speed, flexibility and the solution orientation of a small company.“
Supply-Chain Manager
Automotive
READY.
SET.
Focus.
Material and geometry experiments, tool construction, testing – we have the staff, the equipment and the edge to fulfil your component specifications precisely.
In-house development on point
Material testing
Safeguarding the material properties
Testing
Quality checks and measurements according to standardised test processes.
Tool construction
In-house mould construction for perfect injection-moulded tools and high-quality components.
READY.
SET.
GO.
Get started.
Highly modern machinery, air-conditioned production facility, highly qualified specialist personnel – Your component will be brought to perfect success.
Production competence
Automation
6-Axis robots ensure a high level of dynamics and process safety
Material handling
Central material supply ensures traceability
Processes
Networked digital production planning
A Ready.Set.Go success story
How does the selected plastic behave when it comes into contact with metal? Which potentials does the sandwich injection-moulding process have for technical components? Can the selection of material make the later installation of the component easier? Each day, we ask ourselves questions like these following the Ready.Set.Go principle.
Seat ventilation connecting piece
neo-plastic has optimised a connecting piece for the ventilation of seats for a leading tier-1 supplier.
Ready.
In close consultation with the customer, the possibility of implementing production of the ventilation unit in a more economical manner was assessed.
The main aim was to make subsequent work stages unnecessary thanks to the defined adhesion.
Set.
From extensive experimentation and test processes, a 2-component was developed which has its own developed thermoplastic elastomer. And this combines the product properties required with cohesive adhesion to PA6 and hotmelt.
Go.
Excellent fluidity, outstanding adhesive bonding and good demoulding characteristics ensure constant processes and high quality products.